Civil crews face mobile plant and trucks working close to people, trench collapse, buried services, overhead lines and roadside traffic. Keep people and plant apart, find services before you dig, support every trench that needs it, and do a pre-start on every machine before it works.

What are the critical risks for civil and infrastructure work?

WorkSafe says "Vehicles, moving machinery, heavy objects, and earthworks pose serious risks on civil and building construction sites" (Construction). The main ones:

  • People struck by mobile plant and trucks. WorkSafe has guidance on site traffic management, including safe reversing and spotting, and tipping loads.
  • Trench and excavation collapse. WorkSafe's excavation guidelines say collapses "may occur quickly", and to "shore, bench, or batter back. Do not assume ground will stand unsupported."
  • Striking underground services. The same guidelines say to avoid underground services, use safe digging practice and dig away from them.
  • Overhead power lines near excavators, tippers and cranes.
  • Road and roadside work, with live traffic beside the crew (Road and roadside).
  • Silica dust from cutting concrete and noise from plant and tools (Dust).

Some excavation work needs 24 hours' notice to WorkSafe as particular hazardous work. That includes some trenches where people work more than 1.5 metres deep, and some excavations with a face more than 5 metres high. A collapse of an excavation or its shoring can be a notifiable incident, even if nobody is hurt.

For prequalification, Tōtika's high risk work list includes trenching, traffic management and operated plant hire, which puts those businesses in Category 2 at least. See our Tōtika guide.

Which registers and checks matter most?

  • Plant and equipment: every excavator, roller, tipper and vehicle, with its service and any certificate, and whether it's OK to use today.
  • Pre-starts on every machine, every day it's used.
  • Hazard register with critical risks marked: mobile plant near people, reversing trucks, underground services and excavations.
  • Training register: plant operator tickets, traffic management qualifications and site inductions, with expiry dates.
  • Hazardous substances: diesel, oils and form release, with safety data sheets.
  • Site inspections covering traffic management, barriers around excavations, and marked services.

What starter content does SHE Onsite have for civil crews?

SHE Onsite's starter hazards include people struck by mobile plant, reversing trucks and deliveries, striking underground services when digging, silica dust and hearing damage from loud tools. Each has a starting rating and controls for you to check and change.

The ready-made mobile plant pre-start covers the walk-around and the cab, with critical items such as attachments secure, seatbelt, controls and isolation lever, and brakes. There's also a vehicle pre-start, a site inspection that asks whether traffic management is set up as planned and excavations are barriered or covered, and a site audit that asks whether excavation faces over 1.5 m high are shored or cut back to a safe slope, with a safe way in and out.

What does a day on a civil job look like with SHE Onsite?

6:30 am, the yard. The operator scans the QR label on Excavator 3. Its mobile plant pre-start opens with the machine already chosen.

6:40 am, a failed check. The brakes item fails. Because it's critical, the excavator is marked Out of service in the plant register, everyone sees "Don't use it", and the site manager is told. A fix is set up straight away.

7:00 am, the site. The crew sign in at the gate. Two traffic controllers from a subcontractor sign in on the shared site phone without logins.

7:15 am, JSA. The crew sign on to the JSA for the trench run, which lists the shoring method and the tickets needed.

10:00 am, no signal in the cutting. A labourer reports a near miss with a reversing truck. It saves on the phone and sends when they're back in signal.

2:00 pm, critical control check. The site manager checks that the exclusion zone around working plant is in place, and answers each critical control.

Evacuation drill. The site manager runs a roll call from who's signed in, and saves it as a drill.

This is general information. Check it fits your work. It is not advice.