Roofers and scaffolders work where falls kill people. The critical risks are falls from roof edges, through fragile roofs and from scaffolds, falling objects, scaffold collapse and overhead power lines. Plan every job before anyone goes up, check harnesses and scaffold tags, and give WorkSafe notice of particular hazardous work.
What are the critical risks for roofing and scaffolding?
- Falls from height. WorkSafe says falls from height cause on average 4 deaths and 100 serious injuries a year, and that falls from or through a building are the most common cause of fatal or very serious injuries such as spinal fractures and head injuries (WorkSafe, October 2026). It also warns that short jobs are not an exception: "Whether a job working at height will take five minutes or five hours", fall prevention must be considered.
- Falling through. WorkSafe's roof guidance includes fact sheets on working safely on roofs, on falling through when recladding, and a warning that ceiling battens don't provide fall protection. It says nobody should stand on or work from an external wall top plate "without suitable fall protection".
- Scaffold collapse and falling objects. WorkSafe's scaffolding guidance covers design, use and maintenance. A certified scaffolder holds a current certificate of competence for the type of scaffold.
- Overhead power lines near roofs and scaffolds (Working near low voltage overhead electric lines).
Some of this work needs 24 hours' notice to WorkSafe as particular hazardous work, including some construction work with a risk of falling 5 metres or more, and erecting or dismantling scaffolding with a risk of falling 5 metres or more. Check the exclusions on WorkSafe's page.
For prequalification, Tōtika's lists put roofing services at Category 2 at least, and scaffolding erection and dismantling at Category 3 at least. See our Tōtika guide.
Which registers and checks matter most?
- Plant and equipment: every harness and lanyard by name, with its inspection due, and lifting gear.
- Training register: height safety tickets and scaffolder certificates of competence, with expiry dates.
- Hazard register with critical risks marked: open edges, fragile roofs, falling objects and overhead lines.
- Daily site inspection, including edge protection and scaffold tags.
- JSAs for each roof and each scaffold stage, signed by the crew.
- Contractor register: the scaffold company's insurance and safety plans, if you hire one.
What starter content does SHE Onsite have for this work?
SHE Onsite's starter hazards include falls from open edges and unfinished floors (with edge protection and a harness as controls), falls from ladders and stepladders, and strains from lifting and carrying. Each has a starting rating and controls for you to check and change.
The ready-made site inspection asks whether edge protection and handrails are in place, which is marked critical, and whether the scaffold is tagged and inspected. When you add a harness or lanyard to the plant register, SHE Onsite suggests an inspection every 6 months, which you can change. There's no ready-made harness or scaffold checklist: you build your own, and a pre-start checklist can ask workers to pick the harness from the register.
What does a day on a reroof look like with SHE Onsite?
7:00 am, the gate. The roofing crew sign in by QR poster. Two scaffolders from the scaffold company, who don't have logins, sign in at the gate as subcontractors.
7:10 am, harness checks. Each roofer does the harness pre-start your company built, and picks their own harness from the list.
7:20 am, toolbox talk. The topic is the wind forecast and when work stops. The crew confirm they were there on their phones.
7:30 am, JSA. The leading hand's JSA for stripping the old roof is approved. The crew sign on. The two scaffolders, without logins, are briefed in person and recorded.
9:00 am, a fragile skylight. A roofer reports a skylight with no mesh under it, with a photo. The site manager makes it urgent and adds it to the hazard register.
11:00 am, critical control check. The site manager checks the edge protection critical control on site and taps Yes, in place and working.
Office. The scaffold company's revised scaffold plan is logged on their contractor page and approved, with who approved it and when.
This is general information. Check it fits your work. It is not advice.